Work Photos:

David Sokolsky (Center) selecting floor finishes for the new Daisy Farms Dairy, located south of Paris, Texas. The Agpro groover was selected. |
|

The first barn at Daisy Farm erected. |
|

Glenn Roberts of Five-G inspecting the first equipment for Daisy Farms. |

Ted Gribble at Ranta Farm in Finland during Construction. |
|

Reviewing the site of a new facility in Finland. |
|

One of four double-thirty parlors at Nadec #5. |

At Nadec #5 each dairy barn features 2 double-30 parlors side by side. |
|
 Loading Milk at Nadec #5, Saudi Arabia |
|

Nadec Dairy #5 in Operation in 2007, Saudi Arabia. |

The Elite Dairy (Dairy #6) at Nadec began Construction in the summer of 2007 |
|

When working in many countries, such as Russia, there are many approvals required. |
|

Surveying numerous locations for the best possible site is important, as seen in this visit to Saudi Arabia. |

Foreign work frequently requires seminars and meetings for education. This meeting took place in Saku, Estonia, in November of 2005. |
|

Joe discusses construction of McArthur Farms in Florida. |
|

Joe discussing construction details with a worker in Florida.
|

Ted and Walterio reviewing steel constructions in Utah prepared to Five-G specifications. This meeting took place in Saku, Estonia, in November of 2005. |
|

Joe discussing the new barn with the Dairy Production manager at McArthur Farms in Florida. |
|

Ted and Walterio verifying construction details on a new dairy in Utah. |

Donald working out construction details with contractors in West Texas. |
|

Ted and Su Hao reviewing earthworks on a project in China with the owner's representatives. |
|

Meidema Dairy in Ohio, with third barn added in 2009. |